Request InCT 12 min
Pull here
Queue & TriageCT 20 min
Process RunCT 34 min
Verify & GaugeCT 9 min
Clear State LiveCT 6 min

Process optimization room

Make the moving work easy to see

CDS Business Optimization LLC stands beside operations teams while they pull their busy work off the spreadsheet and onto a real butcher paper wall. We draw the process as it truly runs, mark the waiting, name the rework, and then rebuild the stream so the next request moves faster and stays on rhythm. Across Provo and beyond, the same hand drawn wall has helped service teams, software crews and back office groups see what their daily firefighting had hidden and reset the stream toward a calmer, measurable pace that the whole team can hold.

0 streams mapped
0 kaizen events run
0 hours saved weekly

Six proven resets

Choose your sheet on the table

Each programme below is a single sheet pulled from the roll. Start with one and let the other five follow in order: first you see the real stream, next you steady the pace at the busy step, then you lock the better method down so it survives the week. Together the sheets turn a messy maze into a line your team can read, trust and improve without anyone needing a certification to begin. A Details link on every row opens the full page for each service.

VS-114

Value Stream Mapping Workshops

We set up the butcher paper wall and bring the people who actually do the work together around it. Over a focused session we draw the current state end to end, agree on where the waiting lives, and sketch a future state that removes the waste before anyone reworks the next process alone. Groups finish with a shared picture everyone trusts, a short list of the top wastes you can remove right away, and one future state map that gives every next decision a clear anchor. This sheet is where most walls begin.

TAKT 92 S Details
VS-214

Kaizen Event Facilitation

When a bottleneck needs to move this month, we lead a compact kaizen event aimed exactly at that constraint. A small team focuses on one stream for a concentrated block of days, tests changes on real work, and leaves the area measured, cleaner and visibly faster. You keep the traction after we step away because the people in the room own the improvement from the start.

TAKT 140 S Details
VS-314

Takt Time Analysis

We compute the real pace your customer sets and compare it to how fast your team actually keeps up. The gap between the two shows exactly where the stream is out of breath. We size the crew, sequence the steps and agree a realistic takt the floor can hold without overtime every Friday, so missed commitments stop being a weekly surprise.

TAKT 92 S Details
VS-414

Standard Work Documentation

The best method on the wall is worthless if nobody does it the same way twice. We observe the proven motion, capture it on clear one page sheets, and attach it where the work happens so every person picks up the same reliable sequence. Rework drops because the good habit becomes the only habit, and any new starter learns the proven path in days.

TAKT 140 S Details
VS-514

Pull System Design

We replace the push of work piling up ahead of demand with a gentle pull loop driven by what the customer actually needs next. Signals, kanban squares and capped buffers keep inventory lean and the stream calm, so the team makes what is wanted just in time and nothing more. Interruptions fall away and quality problems surface fast while the work is still small.

TAKT 92 S Details
VS-614

Waste Walk Audits

We walk the actual gemba with your supervisors and name the eight wastes out loud as we see them, from waiting and overproduction to rework and motion. Each walk ends with a short watch list of high impact fixes that the local team owns. The habit of looking becomes part of the daily routine and drift gets caught before it becomes next month problem.

TAKT 140 S Details
640

hours of wasted motion recovered across the programmes we have led beside operations leaders.

We aim for flow over firefight, calm over catch up, and steady rhythm over heroic burst. Measure it, map it, then let the work move on its own.

The improvement loop

Five stops around the track

Every programme follows the same five gate loop drawn around the wall. You walk the loop once to reset a stream that has drifted, then again each quarter as demand shifts and the team learns. Improvement is not a single fix but a rhythm you keep, and the loop keeps every new idea honest by returning it to a measurement.

Observe

Stand where the work lives and watch the real motion before anyone draws an ideal.

Map

Trace the stream end to end on the butcher paper with the people who run it.

Measure

Put a number on cycle time, waiting, quality and the takt your customer sets.

Improve

Test small changes quickly and keep the ones that truly help the stream flow.

Standardize

Set the proven method down as the shared habit. Final stop is marked Standard Work Live.

Q4 WORKSHOP

Open facilitation slots for the next quarter

CDS Business Optimization LLC keeps a short list of open dates on the roll. Reserve a mapping workshop before the season fills and bring your operations lead along for the first wall session.

Book a mapping workshop